Sudarshan Setu: India's longest cable-stayed bridge, spanning 2.32 km, connects Okha to Beyt Dwarka.

4-lane structure for efficient traffic flow, reducing travel time by 30 to 40 minutes.

Solar panels installed on the 2.5-meter footpath generate one megawatt of electricity.

Approach roads are 12.5 and 10 meters long, enhancing connectivity and accessibility.

Project cost amounted to 979 crores, utilizing 10,000 tonnes of steel for construction.